

      
  
  |

Railbed being built
  

View of the railbed being built along the south shore of the
natural pond with the deer station visible in the left hand
picture. On the right you can see conduit being buried for future
use. |
  

View of the small water fall from the railbed. On the
right you can see the heavy equipment had to raise the grade
as much as 3 feet! |
  

Heading south towards the future mine tunnel. Here grade was
lifted 8 feet! |
  

Here the car road had to be raised so the level crossing would
be at grade with the railway. Eventually there will be both
drop arms, lights and bells. |
|
|